Chain impact – tension testing of anchor line
In connection with a mooring operation at a fish farming facility, an able seafarer was injured after being struck by a chain during lowering.
LESSONS LEARNED: The chain was connected to a buoy at one end and a coupling plate at the other. The able seafarer was supposed to release the safety hook and take a new grip. There were tight and short mooring lines at the facility, so the buoys had to be lifted in several stages to bring up the coupling plate. The buoy chain was secured with a load strap to the vessel's railing. There were gusts of wind, but calm seas.
When the able seafarer grabbed the safety hook, a small but rapid rotational movement occured in the chain. This caused the able seafarer to be struck on the hand, resulting in a fracture in the forearm.
The crew member was in a dangerous zone to secure the chain with a load strap, as it was necessary to take a new grip to lift the coupling plate. The work was carried out near or under a suspended load to secure the buoy chain wth a load strap.
The vessel did not have sufficient crane capacity to perform the job in a single lift. Therefore, the chain had to be secured, and the vessel was not equipped with a chain lock.
SJA and risk assessments
A safe job analysis was not conducted before the operation. Due to the weight of the coupling plates, the crew stopped the work to discuss how to secure the chain in the safest possible way.
The risk assessment carried out by the crew before and during the operation was inadequate.
There were also no comprehensive descriptions in the form of procedures or "best practices" for this type of operation.
Measures
The shipping company has several risk-reducing measures being considered after the incident. Here are some examples:
- Risk assessments should be part of an attitude-changing effort aimed at changing behaviour. As a result of an updated risk assessment, a "best practice" for this type of operation should be developed.
- Clarification of the general lifting procedure regarding positioning/movement under suspended loads, and that this should not occur under any circumstances.
- Management and masters should create a plan/routine to achieve better information sharing, improved working methods and an enhancement of the safety culture.
- Customer requirements and technical requirements should be mapped. Some customers do not allow lifting by buoy, some buoys are not approved for lifting, and some buoys pose a risk of damage to buoy lights and AIS markers.
- Management should implement formalised routines that, based on mapping, ensure that vessels have suitable equipment for the tasks they are assigned.
- Based on mapping and identified needs, vessels that do not have sufficient crane capacity should be equipped with chain locks.
- Based on mapping and needs, there are several other technical solutions that may be relevant:
- Approved anchor to lift the frame mooring in cases where the customer does not allow lifting by buoy, or the buoy is not approved for lifting.
- Technical solution to place the frame mooring on the side of the boat and drive the boat towards the coupling plate so that it is lifted up.
- Coupling plate holders that can be operated outside the railing to optimise the crane's working area.
The importance of training and knowledge
It is important that all shipping companies adapt procedures, risk assessments and SJAs for each of their vessels and the conditions the vessel has for carrying out the tasks and assignments it is given.
Crew members who are to perform work on board must be trained and have knowledge about the job to be done so that they can perform the task safely.
If unexpected events occur in the work process, it is important to ensure the safty of the load, chain and similar items. Necessary assessments must also be made on how to perform the task in the best and safest way.